What buyers want to avoid
The most expensive mistakes in stone sourcing happen after approval is assumed too early. Buyers need a supplier that checks the work before it ships, not after damage or mismatch has already occurred.
Pre-production
Confirm scope, material direction, dimensions, and finish requirements before production starts.
In-process
Review sample photos or progress updates so the project stays aligned with approval.
Pre-packing
Verify piece count, labels, protection, and shipment sequence before packing is closed.
Pre-shipment
Check that the packing and delivery route match the destination market and loading plan.
Quality checkpoints
- Confirm drawings, dimensions, and finish requirements before production starts.
- Review material selection and color / vein matching before approval.
- Use inspection photos or sample confirmation at key steps.
- Verify export packing, labels, and shipment sequence before loading.
What buyers can verify
The visible QC process shows inspection, packing, and shipment checkpoints for the agreed scope.
Why this helps project control
Clear QC and delivery information helps buyers assess scope, risk, and the next step.
