What should I send for a stone flooring review?
Share the floor plan or drawings, approximate area, module dimensions, material direction, finish, destination, and any transition or edge details that affect the scope.

Architectural flooring
Review material character, module layout, dimensions, finish, cut-to-size details, inspection, and export packing for hotel and commercial flooring scopes.
Start with a short brief; drawings can follow when they are ready.

Illustrative lobby concept only. It does not document a completed Atelier Marble flooring installation.
Project supply scope
Hotel lobby and reception flooring
Commercial interior stone floors
Corridors and repeatable module programs
Cut-to-size flooring with layout and packing coordination
Built around your drawings
Our own processing and partner coordination in Yunfu, China support architectural flooring scopes. Send a floor plan, BOQ, or module schedule to begin; datum lines, finish samples, and phase packing are agreed before fabrication.
Design and procurement guide
Start the floor review with plans, room or zone names, dimensions, levels, finish schedule, and the current BOQ. Set a datum and layout direction so module positions can be coordinated from a known point. Show borders, feature bands, joints, columns, floor boxes, and other interruptions. Identify where stone begins and ends in relation to carpet, tile, timber, doors, and adjoining public spaces.
For a hotel, commercial interior, or public building, list areas by floor, room type, or zone and assign piece or module marks where needed. State the measurement units, approximate area, quantity, and drawing revision. If a plan, reflected ceiling drawing, or finish schedule gives conflicting room references, note which document controls and who resolves the conflict before the module list is treated as final.
Specify module size, joint line, pattern, border, and orientation. If marble or another directional stone is used, show the intended vein direction and whether selected pieces should be reviewed together. Note any alignment with wall panels, reception features, corridor lines, columns, or thresholds. A repeat module schedule makes quantities easier to review, but it does not mean every piece will have identical color or pattern.
Identify standard pieces, perimeter cuts, special shapes, and one-off transition parts separately. Mark which pieces repeat across rooms and which are unique to one location. If a pattern shifts from one area to another, show that change on a plan or detail. The buyer and designer can then review the expected appearance before confirming material and quantity, rather than relying on an interior rendering to convey the actual layout.
Align modules with thresholds and stair details by showing door openings, transition strips, nosings, risers, landings, skirtings, and changes in floor level. Mark where one surface meets another and who provides any adjoining metal, wood, or tile component. If a stair or threshold has a special profile, provide a section view and identify the finished dimensions and exposed edges.
Confirm how borders and module lines meet at doorways, lifts, corridors, and changes of direction. Show whether cut pieces at perimeters should be centered, balanced, or simply dimensioned from a fixed edge. These choices can affect the piece schedule, visible balance, and installation sequence. The local design and installation team must also review applicable access, safety, and code requirements for the specific building.
Verify slope and drainage with the design team where the floor plan includes wet areas, exterior thresholds, floor drains, or another condition that affects levels. Show drain locations, finished elevations, transitions, and the responsible discipline's requirements on the coordinated drawings. Stone module layout alone cannot define fall, drainage performance, waterproofing, or local compliance; those decisions belong to the design and site professionals responsible for the system.
Separate areas with different levels, substrates, or installation conditions in the schedule. State which dimensions are design intent and which will be confirmed after site preparation. If the subfloor or waterproofing package changes, identify who revises the elevations and module sizes. This keeps the stone quotation anchored to a defined interface instead of assuming that every floor area is ready to receive the same module or finish.
Name the preferred stone, thickness, finish, visible face, and any pattern or color direction by room or zone. Natural stone varies between pieces and lots. If lobby floors, corridors, and reception areas need a coordinated appearance, state which surfaces should be reviewed together and what variation the owner accepts. For a directional layout, note how the vein should run relative to the room and the principal path through it.
Agree the sample or lot approval, finish reference, and responsible approver before the drawing is released. Ask how the selected material and finish affect cleaning and maintenance expectations for the intended use. Those expectations are project-specific; do not infer stain resistance, slip performance, or suitability from the stone name alone. Record any finish or sample changes and review how they affect the floor schedule, cost, or phase sequence.
Share available subfloor information, support or bedding details, movement joints, finished floor heights, and interfaces with doors or fixed equipment. Confirm substrate suitability, installation materials, structural requirements, and site methods with the responsible designer, engineer, and installer. The stone supplier can identify dimensions and material assumptions used in the quotation, but the approved project design governs the floor system and installation.
Identify the point at which the finished site dimensions become final and who verifies them. If multiple trades affect the same floor level, clarify who owns the coordination and what happens when one scope changes. Mark any requirement for a site survey, substrate sign-off, or first-area review. These details prevent a nominal plan size from being mistaken for an approved installation condition.
Keep the latest floor plan, module layout, finish schedule, and BOQ tied to one revision. For each change, note the affected floor, room, module group, quantity, material, or transition. Mark provisional areas separately from approved areas. If a mock-up or sample bay is required, state the question it should answer and who signs off before the rest of the package is released.
Agree which items need checking before packing, such as module dimensions, cut-outs, edge completion, finish, labels, and visible face. Define what photos or records are requested and when they can be supplied. Inspection scope should match the order and the evidence actually provided. Do not imply a site level survey, slip test, structural approval, or certification unless it is specifically arranged and documented.
Group floor modules by building, floor, room, zone, or installation phase so a receiving team can locate them from the schedule. Use consistent piece marks and package labels. If a floor must be handed over in stages, show which areas should arrive together and where temporary storage is available. Share unloading, access, lift, delivery-hour, and on-site handling constraints before packing and freight are quoted.
Confirm the destination and delivery term, then identify who arranges export packing, freight, insurance, customs clearance, unloading, and local movement. Fabrication and packing do not automatically include site installation. The quotation should state its actual supply scope and list open logistics decisions. Delivery timing and freight cost depend on the route, volume, carrier, and agreed terms, so they must be confirmed for the order rather than inferred from the floor area.
Procurement information
The exact quote depends on the confirmed scope. These checkpoints help buyers prepare a useful first brief.
Buyer questions
Share the floor plan or drawings, approximate area, module dimensions, material direction, finish, destination, and any transition or edge details that affect the scope.
A drawing-led review can clarify module sizes, cut lists, layout direction, openings, and the fabrication details needed before a quotation is prepared.
Hotel corridors, lobbies, reception areas, commercial interiors, and other architectural applications can be reviewed case by case with material and delivery requirements confirmed first.
Next step
Send the information you already have. A complete project brief is helpful, but a practical first review can start with rough dimensions.
Request Project Pricing